Collector Krantikumar Pati inspected the OMS kit erected in Annur, Ellapalayam lakes and pump house at Kunnathuranpalayam in Annur taluk under the Athikadavu Avinasi water project.
AAP executive engineer Narendran, assistant executive engineer Muthusamy and Tahsildar Gandhimathi accompanied him.
Under the AAP, 1.5 tmc water will be pumped to 1045 tanks and lakes in Erode Tirupur and Coimbatore districts to irrigate 24468 acre land. Now, 99 percent of the AAP works were completed.